Kitchen Remodeling in Beaumont, TX
Cabinets, counters, islands, lighting and layout changes.

At a glance
The Short Answer
A kitchen refresh can take one to two weeks, and a full remodel with new cabinets and counters usually runs several weeks, longer if walls move. Swapping cabinets, counters and fixtures in place often needs no permit. Moving a wall, a sink or a range does, and that electrical and plumbing work is done by licensed trades.
- Typical timeline
- 1 to 2 weeks for a refresh, several weeks for a full remodel
- Method
- Demo, repair, install, finish
- Materials
- Cabinets with quartz, granite or butcher block
- Permit
- Needed when walls, plumbing or circuits move
- Windstorm (WPI-8)
- Covers roofs, windows, doors, additions and new builds
- Estimate
- Free, in person, in writing
What should you know about kitchen remodeling here?
A lot of kitchens in Beaumont, Port Arthur and Orange were built for a different way of cooking: closed-in galley layouts, low cabinets, one small window over the sink and a single overhead light. Rocha's General Construction remodels kitchens across the Golden Triangle and the rest of Jefferson County, Orange County and Hardin County, from a cabinet and countertop update to a full gut with a new layout and an island.
You get one contractor running the job from demo day to the final punch list.
What goes into a kitchen remodel?
Most kitchen remodels fall into three sizes. A refresh keeps the layout and swaps the surfaces: new counters, backsplash, sink, paint and hardware, maybe new cabinet doors. A replacement keeps the footprint but puts in new cabinets and appliances. A full remodel moves walls, relocates the sink or range, and adds an island or pantry. Each step up adds cost and time, and we price the one you ask for plus the one we think fits the house.
Older houses bring their own work. A kitchen in an older pier-and-beam home in the Oaks Historic District or north Beaumont may have a floor that has dipped at the sink wall from an old leak, or subfloor that went soft under the dishwasher. We fix the floor structure before cabinets go in, because a new cabinet run will show every dip in the floor. Homes built before 1978 may have lead paint on trim and walls, and we talk through that with you before demolition starts.
Walls come up often. Opening a kitchen to the living room means finding out whether the wall is load bearing. If it is, the beam has to be sized and supported correctly, and we bring in the right professional for that decision.
Nearly every kitchen touches plumbing and electrical. New circuits for appliances, under-cabinet lighting, a relocated sink line, a gas range: those parts are done by licensed plumbers and electricians. We coordinate with licensed trades and schedule them in the right order so inspections happen before the walls close.
Materials we install include stock and semi-custom cabinets, quartz, granite and butcher block counters (stone fabrication is often done by a local shop that templates after the cabinets are set), tile backsplashes, luxury vinyl plank and tile floors, and new trim and paint.
In a house that has flooded before, like many near Pine Island Bayou or in parts of Port Arthur after Harvey and again after Imelda, we talk about floor and cabinet choices that handle water better if it ever comes back.

Materials and methods
Stock and semi-custom cabinets, quartz, granite and butcher block counters, cement board and tile for backsplashes, luxury vinyl plank, tile and underlayment, sheetrock and joint compound, trim and crown molding, laser level and cabinet jacks, dust barriers and floor protection, dumpster for demo debris.
How does a kitchen remodel run?
We meet at the house, look at the kitchen and the rooms around it, and talk about what bothers you in the current layout. Bring photos of kitchens you like.
We measure and draw the layout, then price it in writing, with an allowance for items you have not picked yet.
You choose cabinets, counters, tile and fixtures. We order long-lead items before demo so the kitchen is not torn out while you wait.
Demo, then repairs to framing, floor and walls. Licensed trades rough in plumbing and electrical, and inspections are scheduled.
Sheetrock, cabinets, counter templating and install, backsplash, flooring, trim and paint.
Fixtures and appliances go in, the trades make final connections, and we walk the punch list with you.
Permits and inspections
Does a kitchen remodel need a permit?
Swapping cabinets, counters and fixtures in the same spots often needs no permit. Moving a wall, a sink or a range, or adding circuits, does, and that electrical and plumbing work is done by the licensed trades it requires. We tell you at the estimate whether your kitchen crosses that line.
In Jefferson and Chambers counties, roof, window, door and addition work can also need a Texas Department of Insurance windstorm inspection during the job.
Why hire Rocha's General Construction?
A kitchen remodel lives or dies on scheduling. We order ahead, sequence the trades, and tell you when something slips instead of letting the job sit.
Your estimate separates fixed costs from allowances, so you know which numbers can move. You deal with one person from the first visit to the last walkthrough. We are local to the Golden Triangle, with our office in Groves, and we are around after the job is done.
Pricing
What Moves the Price
Layout changes
Keeping the sink and range where they are costs far less than moving them or opening a wall.
Cabinets and counters
Stock or semi-custom cabinets, and quartz, granite or butcher block tops.
What is behind the walls
Subfloor and framing repair found at demo, talked through before the work changes.
FAQ
Kitchen Remodeling FAQ
How long does a kitchen remodel take?
A refresh can take one to two weeks. A full remodel with new cabinets and counters usually runs several weeks, longer if walls move. Material lead times are the biggest variable.
Can I use my kitchen during the remodel?
Not for most of it. We can help you set up a temporary sink and counter in another room so you can still make coffee and simple meals.
Who does the plumbing and electrical?
Licensed plumbers and electricians. We coordinate with licensed trades, schedule them, and make sure inspections happen before walls are closed.
Related Services
- Bathroom RemodelingShowers, tubs, tile, vanities, walk-in and aging-in-place baths
[Photo placeholder]Bathroom Remodeling
- Drywall & Sheetrock RepairNew sheetrock, patching, texture matching and leak or flood damage repair
[Photo placeholder]Drywall & Sheetrock Repair
- Interior & Exterior PaintingPrep, prime and finish coats inside and out
[Photo placeholder]Interior & Exterior Painting
Answered by Rocha's General Construction · Updated
Get a Free Kitchen Remodeling Estimate
Call 409-248-2534 or send the form and we will set up a time to look at the job.