Remodel in Beaumont, TX
Kitchen and bathroom remodels, sheetrock and paint. Humidity, slow leaks and moving clay soil show up inside a Southeast Texas house long before a room looks dated, so the estimate looks at what is behind the finish as well as the finish itself.

4 services
Remodel Services
Kitchen Remodeling
Cabinets, counters, islands, lighting and layout changes.
- Timeline
- 1 to 2 weeks for a refresh, several weeks for a full remodel
- Permit
- Needed when walls, plumbing or circuits move
Bathroom Remodeling
Showers, tubs, tile, vanities, walk-in and aging-in-place baths.
- Timeline
- 1 to 2 weeks for an update, 2 to 4 for a tile shower
- Permit
- Needed when plumbing or the layout changes
Drywall & Sheetrock Repair
New sheetrock, patching, texture matching and leak or flood damage repair.
- Timeline
- Given in your written estimate
- Permit
- Usually not needed
Interior & Exterior Painting
Prep, prime and finish coats inside and out.
- Timeline
- Given in your written estimate
- Permit
- Not needed